Thursday, November 26, 2009

Examples of Good and Poor Quality Work


This is a good example of what an assembled project should look like.


This is an example of a poorly aligned false top and side from front view. It can be fixed by sanding smooth.


This shows how false top and side should be aligned from front view.


This is a poor example of how the false top and side should be aligned from the back side view. this will result in a space or gap between the back panel and the side. the shelf will bow out the back panel.


This shows how the false top and side should line up from the back side view.



This is a good example of how the shelf should align with the side. They should be flush. The shelf should also fit snugly into the dado or groove.

No comments:

Post a Comment